nnhb
nnhb
Current Position:
Homepage
/
/
/
Raiders maintenance strategy

Raiders maintenance strategy

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2020-02-24 16:00
  • Views:

(Summary description)The lifeboat is a boom-type fully enclosed glass fiber reinforced plastic lifeboat, one on each side and no rescue boat. Everyone should know what it is doing by the name. Today I will tell you a litt

Raiders maintenance strategy

(Summary description)The lifeboat is a boom-type fully enclosed glass fiber reinforced plastic lifeboat, one on each side and no rescue boat. Everyone should know what it is doing by the name. Today I will tell you a litt

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2020-02-24 16:00
  • Views:
Information

The lifeboat is a boom-type fully enclosed glass fiber reinforced plastic lifeboat, one on each side and no rescue boat. Everyone should know what it is doing by the name. Today I will tell you a little bit!

The lifeboat davit includes a motor with a total of 22 grease nipples and a total of 44 on both sides. Butter can be added normally. The motor has been maintained at the shipyard, the whole is disassembled, the gears are clean, and the refueling is active. Every month, you will refuel the butter nozzle, mainly during the boating exercise, prepare a butter gun and wire oil before launching the boat. Observe the butter mouth until there is butter overflowing from the gap, indicating that the butter mouth is okay, and the butter is also added. Steel wire oil is generally refueled when the lifeboat is placed on the water surface for recovery. The steel wire was renewed for 5 years, and the lifeboat wire on both sides of the wheel was replaced in 2014. When releasing the boat, pay more attention to whether the wire turntable can rotate normally. If it is found that it does not turn, immediately remove the oil sludge and remove the rust to maintain it to normal. The rust removal and maintenance of the boat frame arm is usually done before it can be touched. When the entire boom is lifted out when some gaps, corners, etc. are released, ask other crew members to help, and it will be completed quickly. General maintenance can ensure a longer time.

nnhb

Tel:+86-0771-5513372  +86-0771-5513375  +86-0771-5585704
Address:No. 55 Jinhu Road., YAHAN CAIFU Building room No. 2408. 
Nanning, Guangxi, China
Fax : +86-0771-5513371
E-mail:
gxhuibang@vip.163.com
Url:www.hbmarine.cn  汇邦贸易.网址

nnhb

Official mobile site

Copyright © 2011 hbmarine.cn All Rights Reserved
桂ICP备108002962 
PowerBy 300.cn
This site supports ipv6